How to reorder line items in the budget
You can reorganize cost headings and line items to better match your project structure.
To reorder top-level cost headings:
- Click the three dots on the far right of the Project Total row.
- Select Reorganize top-level line-items.
- Drag and drop the headings into the desired order.
To reorder items within a category:
- Click the three dots on the far right of the category line.
- Select Reorganize line-items within the category.
To move a line item or category to another heading:
- Click the three dots next to the item or category
- Select Move line-item to or Move category to
- Choose the new location and confirm the move